Skipper’s first plumbing

First ever plumbing (aside from minor household repairs to leaking joints) for the skipper resulted in a successful outcome, if it took several hours longer than originally anticipated. Lack of space – the difference between buying a product and fitting the product to your own specific environment – meant a spacer was required to bridge from the fitting supplied with the Seagull tap to the underside of the worktop. It took trips to the chandlery, then Halfords, then eventually ToolStation before he found a satisfactory part that could do the job.

New tap!

New tap!

This entry was posted in 2014-2015 a family adventure, l'equipement. Bookmark the permalink.

1 Response to Skipper’s first plumbing

  1. Christopher Borde says:

    Amazing. Looking forward to reading posts of your adventure with the girls. Best of luck to the crew. Chris, Della and Anais.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s